| Structure: RCC framed structure with Large Column free spaces |
| Super structure: Walls with combination of AAC Blocks and cement mortar |
| Plastering: Smooth / Sponge finished in cement mortar for internal and external walls respectively |
Paints: External walls finished with Textured paints / Acrylic emulsion / ACP cladding / Structural glazing.
Internal walls finished with plastic emulsion over a smooth surface |
| Doors: Engineered door frames with flush shutters |
| Windows and Ventilators: Structural glazing / powder coated aluminum windows / glazing |
Flooring:
Entrance lobbies: Combination of Granite & Vitrified tiles Corridors : Vitrified Tiles Inside the office : 60mm thick IPS flooring Toilets: Anti-skid cramic rustic Tile Floorig /Ceramic tile dado up to door height Staircase & Service rooms: Flooring and skirting with Kota stone |
| Toilets: Standard sanitary ware in white color, standard CP fittings |
| False Celing: Lobbies & Corridors are provided with false ceiling wih light fixtures |
| Fire Protection: Automatic fire detection, fire fighting& smoking management system- all as per DGFS / National
building codes. |
| Centralized Air Conditioning : High side air-conditiong for all offices, completed with high side & low side for corridors & lobbies |
Electrification: Metered Power supply for each office
100% D.G. back up with Auto Mains failure
|
Communication System: Provision of Two telephone connections for every shop & office Wi-fi environment for internet
Intercom with the security and all other important spaces within the building |
Green Techologies:
Sewage treatment plant
Zero discharge
Rain waterharvestng and recyclng
Use of green construction materials and technologies
Irrigation system for landscaping using STP water
|
| Building Mainteance System: IBMS for optial & effective maintenance |
Vertical transportation system:
High speed elevators
Escalators in shoppng floors
Seperate elevators for parking floors
Dedicated Goods/ Service Lifts |
Vehicle Parking:
3 basements for parking
Provisions for 2-tier mechanical parking in basement-1 |
| Security Systems: CCTV/Surveillance cameras at all entry and exit points of the building |
| |