View Progress
Home | Group Home | Contact
  Magnificent Environs | Royal Invitation | Amenities | PropServe | Specifications | Floor Plans | Location Map | Download Brochure | Pricing  
 
 

Specifications

 
Structure: R.C.C. framed structure.
Super Structure: Aerocon blocks finished with cement plaster.
Doors: Engineered door frames & shutters.
Windows: UPVC windows with clear glass.

Flooring: Vitrified tiles inside the flats, marble in corridors and staircases.

Toilets: Anti-skid ceramic tile flooring. Glazed tiles dado up to door height. Shower cubicle with single lever concealed
wall mixer in the master bedroom.
Kitchen: Granite platform, stainless steel sink and 2’ height designer ceramic / glazed tiles dado above cooking platform.
Provision for chimney, Hob and exhaust fan; reticulated gas supply system.
Electrification: Hall, bedroom, kitchen and toilets shall be provided with adequate numbers of light, fan and power points.
Points for air conditioning in all bedrooms. Telephone point and TV point in hall and master bedroom, internal point in
drawing/master bedroom.
Water Supply and Sanitary: CI / PVC for sewerage lines. GI / CPVC / Kitec / other equivalent quality pipes for water
supply. High quality CP fittings of standard make & sanitary ware.
Walls: Internal walls finished with plastic emulsion paints over smooth finish. External walls with combination of texture
and acrylic paints.
Air conditioning provision: Copper pipes provided for split air conditioner in master bedroom. (Power and drain points
provided.)
100% DG backup
 
 

© Manjeera 2009